STATUS ALERT: MISO has proposed this change through its Planning Subcommittee process. The stakeholder process is expected to close in October 2026, with a FERC filing anticipated in Q4 2026 and an effective date targeted for year-end 2026. No tariff filing has been made, and no FERC docket has been opened. We will publish a follow-up once MISO files.
Executive Summary:
MISO’s Independent Market Monitor has recommended that battery assets in MISO be exempt from paying for transmission service when charging. The proposed relief applies only to charging under economic dispatch. A resource that self-schedules its charging would continue to procure and pay for transmission service in full. MISO is currently the only U.S. RTO/ISO that imposes this requirement, which has negatively impacted the financial profile for battery storage in MISO. The Independent Market Monitor’s (IMM) position is that a battery functioning in the wholesale market is closer to that of a generator than to retail load. Charging for transmission service is having a negative impact on the charge and discharge decisions that make the asset valuable to the system. Removing these charges improves the financial outlook for storage in MISO.
The recommendation arrives as MISO’s storage fleet surpasses 1.3 GW of market-participating assets. MISO’s stakeholder process is expected to close in October 2026, with a FERC filing anticipated in Q4 2026 and an effective date targeted for year-end 2026, subject to approval. In the article below, we outline the current transmission requirement, what MISO has proposed, and what storage owners should be doing while the process is open.
This article covers topics that include:
(click to skip ahead)
What MISO Requires of Storage Assets Today
A storage resource participating in MISO’s energy and reserves markets is modeled as a directly connected asset to transmission infrastructure. When a resource draws energy from the system to charge, MISO treats the draw as a transmission service event. The resource must participate in transmission service to support the charge through Network Integration Transmission Service (NITS) or some other mechanism. There is a narrow exemption for charging to provide Regulating Service or Down Ramp Capability, but outside of those edge cases, charging a battery carries a transmission cost. This obligation exists whether the battery is charging on its own accord or because of a MISO-instructed dispatch. A resource following an economic dispatch signal incurs a transmission cost for simply doing what the market asked of it. That distinction between self-directed and instructed charging carries no weight under today’s rules, which is precisely what MISO is now proposing to change.
The requirement has been a controversial stakeholder issue in MISO for several years, surfacing repeatedly through the Planning Advisory Committee process, where developers have argued that the transmission treatment overreaches.
What the MISO Independent Market Monitor is Recommending
The IMM’s argument is founded on a distinction between two kinds of system users.
Carrie Milton of the IMM framed the argument in terms of incentives. Retail load consumes electricity without regard to system conditions, and in doing so directly places strain on the transmission network. A storage asset behaves differently. As a wholesale market participant responding to price signals, a battery charges when energy is abundant and inexpensive, generally when the system is the least stressed, and discharges when it is scarce. Its commercial incentives and the transmission system’s operational needs are aligned. In her characterization, storage assets help the system, rather than strain it.
IMM’s David Patton extended this point by making an analogy to traditional generation assets’ interaction with the wholesale system. Despite a generator using the transmission system, MISO does not bill generators for transmission service in the way it bills load. A generator’s relationship to the grid is fundamentally different. Patton’s position is that a battery’s use of the system resembles that of conventional generation, and the same reasoning that exempts generators should also apply to storage assets.
What MISO Has Proposed
MISO’s proposal, presented through its Planning Subcommittee, would lift transmission use charges on most energy storage resources, with conditions.
The relief applies only to charging under economic dispatch. Where MISO’s dispatch engine puts a resource into charging mode based on five-minute prices and system conditions, no transmission service charge would apply. Where an owner self-schedules charging, and MISO honors that schedule regardless of price, full transmission service obligations remain in place.
This follows MISO’s cost-causation logic. Dispatched storage is providing a grid service. Self-scheduled charging is consumption on the owner’s terms without regard to system conditions, which is functionally how retail load behaves. MISO is not extending generator-style treatment to behavior that resembles load.
The change would also align MISO with peer ISOs in the US, none of which impose the transmission charges on storage charging in response to economic dispatch.
The Case Against the Change
The IMM recommendation did not go unchallenged. MISO’s board member Joel Cook questioned why batteries should receive an exemption that other system users do not, framing his argument that the transmission system costs money to build and everyone who uses it should be paying for it. The objection brings attention to the core issue of whether the pattern of transmission use from batteries warrants treatment closer to generation than to load. The economic dispatch condition is, in part, a response to that objection. It concedes that a battery consuming on its own schedule should pay, and limits relief to the case where MISO itself directed the draw.
How This Impacts Storage Economics
Patton’s critique is that the current structure constrains how storage owners make charge and discharge decisions. Every charging decision carries an additional layer of transmission cost that is independent of energy price signals. An owner weighing whether to charge at a given interval responds not solely to the market price spread, but to the price spread net of transmission costs. Intervals that would otherwise justify a charge may not clear the cost bar, and the resulting dispatch is not true to the market signal.
Patton also identified transmission relief as a principal business case for storage. His logic for this argument is as follows:
- Project Siting: A battery placed where renewable energy output is high can absorb that energy locally rather than forcing it into the transmission network to reach load. Congestion that would otherwise need to be managed never materializes.
- Discharging to Relieve Constraints: On the discharging side, a battery positioned on the correct side of a system constraint can relieve it directly, substituting the need to dispatch other resources.
Both arguments depend on storage owners being free to charge and discharge according to system conditions, not bound by added transmission costs. A cost layer that discourages this practice works against the very behavior that produces the system benefit.
The economic dispatch condition also means the exemption is one an owner can forfeit through its own bidding practice. Hours run on a self-schedule would remain fully chargeable. That creates an incentive to leave assets in economic mode and manage state of charge through the offer curve. It also means the value of the change varies by asset. A merchant battery running economically captures nearly all of it. A bilaterally-contracted asset that self-schedules to meet delivery obligations captures considerably less.
Part of what gives this recommendation weight is the current trajectory of storage participation in MISO. The storage fleet now exceeds 1.3 GW across 22 market-participating resources, setting system prices in roughly 5% of pricing intervals. Patton expects a considerably larger buildout in the future and has raised concerns about whether MISO’s long-term planning is ready for it. He argued that if storage is undervalued in the planning models, the transmission buildouts that result will be undersized. Furthermore, if transmission costs continue to suppress charging behavior, storage will deliver less system relief than it otherwise could.
Is Your MISO Storage Asset Positioned for a Potential Rule Shift?
SYSO is a registered MISO Market Participant with a 24/7 NERC-CIP-compliant operations center and dedicated telemetry for storage assets.
What Remains Unresolved
For storage owners and developers in MISO, the practical position is to continue operating under current conditions while tracking support for the IMM’s recommendation. We will publish a follow-up article once MISO confirms a direction.
Item | Status |
IMM Recommendation to End Transmission Charges on Storage Assets | Presented and under discussion |
MISO Position | Not announced |
Board Consensus | Split; Objections raised |
Tariff Filing | None |
FERC Docket | None; Expected Q4 2026 |
Effective Date | None; Year-end 2026 target, pending FERC approval |
Stakeholder Process | Expected to close October 2026 |
How SYSO Supports Storage Assets in MISO
The value of a storage asset in MISO is determined by how well it charges and discharges against real-time market conditions. SYSO is an active MISO Market Participant, supporting renewable and storage developers and asset owners across the region with more than 1 GW of projects under management in MISO. Our team manages the full operational lifecycle for storage assets, including revenue forecasting, capacity auction offer management, capacity bilateral transaction support, daily scheduling in energy and ancillary services markets, asset telemetry, 24/7 control room operations, financial settlement, and storage optimization. Contact us today to discuss how we can support your MISO storage portfolio and to stay current as this issue develops.